1 active project totaling 17 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
17active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-012 Not reported 230 225 Gas Withdrawn
GEN-2014-043 Not reported 115 80 Solar Withdrawn
GEN-2016-177 Not reported 115 17 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.