Gage, NE interconnection queue

7 active projects totaling 1,720 MW in the SPP queue, plus 2 with terminal status (shown grayed).

7active projects
1,720active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-222 Not reported 345 478 Gas Active
GEN-2024-022 Not reported 345 390 Gas Active
GEN-2024-023 Not reported 345 270 Gas Active
GEN-2001-029N Not reported n/r 250 Gas Operational
GEN-2023-223 Not reported 345 239 Gas Active
GEN-2022-039 Not reported 115 185 Wind Withdrawn
GEN-2007-010N01 Not reported n/r 100 Wind Withdrawn
GEN-2024-019 Not reported 345 62 Gas Active
GEN-2024-018 Not reported 345 31 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.