Floyd, TX interconnection queue

2 active projects totaling 500 MW in the SPP queue, plus 10 with terminal status (shown grayed).

2active projects
500active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-007 Not reported 345 400 Wind Withdrawn
GEN-2008-130 Not reported n/r 300 Wind Withdrawn
GEN-2015-070 Not reported 345 300 Solar Withdrawn
GEN-2018-073 Not reported 345 250 Solar Withdrawn
GEN-2024-041 Not reported 345 250 Wind Active
GEN-2024-042 Not reported 345 250 Wind Active
GEN-2004-004 Not reported n/r 240 Wind Withdrawn
GEN-2012-038 Not reported 345 203 Gas Withdrawn
GEN-2014-074 Not reported 345 152 Wind Withdrawn
GEN-2015-033 Not reported 345 152 Wind Withdrawn
GEN-2008-014 Not reported 345 150 Wind Withdrawn
GEN-2008-015 Not reported n/r 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.