Fillmore, NE interconnection queue

1 active project totaling 200 MW in the SPP queue, plus 3 with terminal status (shown grayed).

1active projects
200active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-096 Not reported 345 227.7 Wind Withdrawn
GEN-2024-168 Not reported 115 200 Solar Active
GEN-2006-038N017 Not reported n/r 100 Wind Withdrawn
GEN-2017-006 Not reported 345 73.6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.