0 active projects
totaling 0 MW in the SPP queue, plus 7 with terminal status (shown grayed).
0active projects
0active MW
7total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2018-047
Not reported
345
300
Wind
Withdrawn
GEN-2016-122
Not reported
345
225
Wind
Withdrawn
GEN-2016-112
Not reported
345
220
Wind
Withdrawn
GEN-2018-123
Not reported
345
200
Wind
Withdrawn
GEN-2016-113
Not reported
345
155
Wind
Withdrawn
GEN-2017-035
Not reported
115
85
Wind
Withdrawn
GEN-2017-034
Not reported
115
25
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.