Substation Scout

Ellsworth, KS interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 7 with terminal status (shown grayed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-047 Not reported 345 300 Wind Withdrawn
GEN-2016-122 Not reported 345 225 Wind Withdrawn
GEN-2016-112 Not reported 345 220 Wind Withdrawn
GEN-2018-123 Not reported 345 200 Wind Withdrawn
GEN-2016-113 Not reported 345 155 Wind Withdrawn
GEN-2017-035 Not reported 115 85 Wind Withdrawn
GEN-2017-034 Not reported 115 25 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first