3 active projects totaling 565.8 MW in the SPP queue, plus 12 with terminal status (shown grayed).

3active projects
565.8active MW
15total filed
Queue IDProjectkVMWResourceStatus
GEN-2011-028 Not reported 345 300.8 Wind Withdrawn
GEN-2008-029 Not reported 138 250.5 Wind Withdrawn
GEN-2015-060 Not reported 138 250.5 Wind Withdrawn
GEN-2012-025 Not reported 345 250 Wind Withdrawn
GEN-2021-099 Not reported 345 250 Wind Withdrawn
GEN-2016-003 Not reported 345 248.4 Wind Operational
GEN-2007-061 Not reported n/r 200 Wind Withdrawn
GEN-2008-065 Not reported n/r 200 Wind Withdrawn
GEN-2001-023 Not reported n/r 180 Gas Withdrawn
GEN-2011-020 Not reported 345 165.6 Wind Active
GEN-2017-011 Not reported 345 151.8 Solar Active
GEN-2005-006 Not reported n/r 150 Wind Withdrawn
GEN-2021-015 Not reported 345 74.9 Solar Withdrawn
GEN-2013-034 Not reported 345 73.6 Wind Withdrawn
GEN-2006-001 Not reported n/r 45 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first