Elk, KS interconnection queue
2 active projects totaling 599.8 MW in the SPP queue, plus 5 with terminal status (shown grayed).
2active projects
599.8active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-125 | Not reported | 345 | 400 | Solar | Active |
| GEN-2023-200 | Not reported | 345 | 300 | Solar | Withdrawn |
| GEN-2004-024 | Not reported | n/r | 201 | Wind | Withdrawn |
| GEN-2004-002 | Not reported | n/r | 200 | Wind | Withdrawn |
| GEN-2005-013 | Not reported | 345 | 199.8 | Wind | Operational |
| GEN-2005-016 | Not reported | n/r | 150 | Wind | Withdrawn |
| GEN-2010-013 | Not reported | 345 | 50.4 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.