Elk, KS interconnection queue

2 active projects totaling 599.8 MW in the SPP queue, plus 5 with terminal status (shown grayed).

2active projects
599.8active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-125 Not reported 345 400 Solar Active
GEN-2023-200 Not reported 345 300 Solar Withdrawn
GEN-2004-024 Not reported n/r 201 Wind Withdrawn
GEN-2004-002 Not reported n/r 200 Wind Withdrawn
GEN-2005-013 Not reported 345 199.8 Wind Operational
GEN-2005-016 Not reported n/r 150 Wind Withdrawn
GEN-2010-013 Not reported 345 50.4 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.