Dunn, ND interconnection queue

1 active project totaling 300 MW in the SPP queue, plus 1 with terminal status (shown grayed).

1active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-331 Not reported 345 300 Battery Active
GEN-2022-018 Not reported 345 186 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.