8 active projects totaling 902.4 MW in the SPP queue, plus 20 with terminal status (shown grayed).

8active projects
902.4active MW
28total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-063 Not reported 345 300.6 Wind Withdrawn
GEN-2011-015 Not reported 345 300.6 Wind Withdrawn
GEN-2008-019 Not reported 345 300 Wind Withdrawn
GEN-2008-020 Not reported n/r 300 Wind Withdrawn
GEN-2008-123 Not reported n/r 300 Wind Withdrawn
GEN-2016-083 Not reported n/r 300 Wind Withdrawn
GEN-2011-024 Not reported 345 299 Wind Withdrawn
GEN-2025-SR30 Not reported 345 209 Battery Active
GEN-2009-071 Not reported 345 200 Wind Withdrawn
GEN-2015-049 Not reported 345 200 Wind Withdrawn
GEN-2007-021 Not reported 345 198.9 Wind Operational
GEN-2008-044 Not reported 345 197.8 Wind Operational
GEN-2015-081 Not reported 345 180 Wind Withdrawn
GEN-2015-029 Not reported 345 161 Wind Withdrawn
GEN-2021-098 Not reported 138 160 Hybrid Withdrawn
GEN-2023-SR10 Not reported 345 160 Battery Withdrawn
GEN-2005-009 Not reported n/r 150 Wind Withdrawn
GEN-2006-046 Not reported 138 129.6 Wind Operational
GEN-2011-051 Not reported 345 104.4 Wind Withdrawn
GEN-2003-001 Not reported n/r 100 Wind Withdrawn
GEN-2002-017 Not reported n/r 99 Wind Withdrawn
GEN-2022-SR5 Not reported 345 85 Battery Withdrawn
GEN-2023-SR5 Not reported 345 85 Battery Active
GEN-2011-060 Not reported 138 80 Wind Withdrawn
GEN-2011-061 Not reported 69 52 Wind Withdrawn
GEN-2026-PR2 Not reported 345 41.9 Wind Active
GEN-2010-011 Not reported 345 29.7 Wind Operational
GEN-2014-002 Not reported 345 10.5 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.