0 active projects
totaling 0 MW in the SPP queue, plus 6 with terminal status (shown grayed).
0active projects
0active MW
6total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2013-036
Not reported
345
250
Wind
Withdrawn
GEN-2023-072
Not reported
138
250
Wind
Withdrawn
GEN-2023-138
Not reported
345
250
Wind
Withdrawn
GEN-2021-079
Not reported
345
140
Hybrid
Withdrawn
GEN-2021-067
Not reported
138
100
Hybrid
Withdrawn
GEN-2023-162
Not reported
138
100
Hybrid
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.