Dekalb, MO interconnection queue

1 active project totaling 200.1 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
200.1active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-005 Not reported 345 200.1 Wind Operational
GEN-2016-088 Not reported 345 151.2 Wind Withdrawn
GEN-2016-040 Not reported 345 18.4 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.