Decatur, KS interconnection queue

1 active project totaling 270 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
270active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-015 Not reported 345 270 Solar Active
GEN-2022-025 Not reported 345 200 Solar Withdrawn
GEN-2022-026 Not reported 345 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.