Substation Scout

Deaf Smith, TX interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 11 with terminal status (shown grayed).

0active projects
0active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-067 Not reported 230 356 Gas Withdrawn
GEN-2024-363 Not reported 230 300 Solar Withdrawn
GEN-2017-029 Not reported 230 270 Wind Withdrawn
GEN-2018-001 Not reported 230 270 Wind Withdrawn
GEN-2015-101 Not reported 230 240 Wind Withdrawn
GEN-2014-068 Not reported 230 203 Gas Withdrawn
GEN-2008-067 Not reported n/r 160 Wind Withdrawn
GEN-2017-058 Not reported 115 135 Solar Withdrawn
GEN-2007-026 Not reported n/r 130.2 Wind Withdrawn
GEN-2014-010 Not reported 115 129.6 Wind Withdrawn
GEN-2015-039 Not reported 230 50.1 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first