0 active projects
totaling 0 MW in the SPP queue, plus 5 with terminal status (shown grayed).
0active projects
0active MW
5total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2019-060
Not reported
345
150
Wind
Withdrawn
GEN-2015-097
Not reported
115
100
Wind
Withdrawn
GEN-2019-032
Not reported
230
63.1
Battery
Withdrawn
GEN-2019-057
Not reported
230
63.1
Solar
Withdrawn
GEN-2016-164
Not reported
115
7.9
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.