GEN-2022-219 Not reported 230 350 Solar Withdrawn
GEN-2017-109 Not reported 230 320.9 Wind Withdrawn
GEN-2024-223 Not reported 230 241 Wind Withdrawn
GEN-2016-105 Not reported 230 120 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.