Dallam, TX interconnection queue

2 active projects totaling 500 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2active projects
500active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-143 Not reported 230 250 Wind Active
GEN-2024-145 Not reported 230 250 Wind Active
GEN-2003-017 Not reported n/r 80 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.