Custer, NE interconnection queue

3 active projects totaling 355 MW in the SPP queue, plus 9 with terminal status (shown grayed).

3active projects
355active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-001 Not reported 345 250 Wind Withdrawn
GEN-2023-133 Not reported 345 250 Wind Withdrawn
GEN-2016-074 Not reported 345 200 Wind Active
GEN-2024-233 Not reported 115 150 Wind Withdrawn
GEN-2016-026 Not reported 115 120 Wind Withdrawn
GEN-2006-038N006 Not reported n/r 100 Wind Withdrawn
GEN-2006-038N007 Not reported n/r 100 Wind Withdrawn
GEN-2016-025 Not reported n/r 100 Wind Withdrawn
GEN-2006-038N005 Not reported 115 80 Wind Operational
GEN-2006-037N1 Not reported 115 75 Wind Operational
GEN-2010-038 Not reported 115 74.9 Wind Withdrawn
GEN-2012-039 Not reported 115 74.9 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.