Crawford, KS interconnection queue
3 active projects totaling 429.8 MW in the SPP queue, plus 4 with terminal status (shown grayed).
3active projects
429.8active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2003-012 | Not reported | n/r | 350 | Gas | Withdrawn |
| GEN-2023-231 | Not reported | 345 | 310 | Hybrid | Withdrawn |
| GEN-2024-069 | Not reported | 69 | 228 | Hybrid | Active |
| GEN-2023-025 | Not reported | 161 | 200 | Battery | Withdrawn |
| GEN-2024-287 | Not reported | 345 | 199.8 | Solar | Active |
| GEN-2017-050 | Not reported | 69 | 25 | Solar | Withdrawn |
| GEN-2012-044 | Not reported | 69 | 2 | Gas | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.