Crawford, KS interconnection queue

3 active projects totaling 429.8 MW in the SPP queue, plus 4 with terminal status (shown grayed).

3active projects
429.8active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2003-012 Not reported n/r 350 Gas Withdrawn
GEN-2023-231 Not reported 345 310 Hybrid Withdrawn
GEN-2024-069 Not reported 69 228 Hybrid Active
GEN-2023-025 Not reported 161 200 Battery Withdrawn
GEN-2024-287 Not reported 345 199.8 Solar Active
GEN-2017-050 Not reported 69 25 Solar Withdrawn
GEN-2012-044 Not reported 69 2 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.