Cowley, KS interconnection queue
2 active projects totaling 258 MW in the SPP queue, plus 7 with terminal status (shown grayed).
2active projects
258active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2004-010 | Not reported | n/r | 300 | Wind | Withdrawn |
| GEN-2011-002 | Not reported | 69 | 300 | Wind | Withdrawn |
| GEN-2011-039 | Not reported | 345 | 300 | Wind | Withdrawn |
| GEN-2024-061 | Not reported | 138 | 200 | Battery | Active |
| GEN-2011-004 | Not reported | 138 | 150.4 | Wind | Withdrawn |
| GEN-2022-041 | Not reported | 69 | 100 | Solar | Withdrawn |
| GEN-2020-003 | Not reported | 69 | 58 | Hybrid | Active |
| GEN-2023-121 | Not reported | 69 | 50 | Solar | Withdrawn |
| GEN-2016-173 | Not reported | 69 | 42 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.