0 active projects
totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2020-009
Not reported
345
300
Hybrid
Withdrawn
GEN-2023-188
Not reported
345
160
Hybrid
Withdrawn
GEN-2017-053
Not reported
69
50
Solar
Withdrawn
GEN-2011-035
Not reported
69
20
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.