Substation Scout

Cotton, OK interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-009 Not reported 345 300 Hybrid Withdrawn
GEN-2023-188 Not reported 345 160 Hybrid Withdrawn
GEN-2017-053 Not reported 69 50 Solar Withdrawn
GEN-2011-035 Not reported 69 20 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.