Cottle, TX interconnection queue

2 active projects totaling 552 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2active projects
552active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-317 Not reported 345 300 Solar Active
GEN-2018-015 Not reported 345 252 Solar Active
GEN-2023-228 Not reported 345 250 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.