Coal, OK interconnection queue
2 active projects totaling 700 MW in the SPP queue, plus 1 with terminal status (shown grayed).
2active projects
700active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-165 | Not reported | 345 | 500 | Hybrid | Active |
| GEN-2023-038 | Not reported | 138 | 200 | Solar | Active |
| GEN-2022-110 | Not reported | 138 | 150 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.