Carter, OK interconnection queue

4 active projects totaling 680.8 MW in the SPP queue, plus 8 with terminal status (shown grayed).

4active projects
680.8active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-085 Not reported 345 500 Solar Withdrawn
GEN-2017-166 Not reported 345 250 Solar Withdrawn
GEN-2021-004 Not reported 138 250 Hybrid Withdrawn
GEN-2024-242 Not reported 138 250 Battery Active
GEN-2024-337 Not reported 138 250 Hybrid Active
GEN-2020-074 Not reported 345 200 Battery Withdrawn
GEN-2022-042 Not reported 138 174 Solar Withdrawn
GEN-2017-027 Not reported 138 140 Wind Operational
GEN-2010-019 Not reported 69 52.2 Wind Withdrawn
GEN-2017-167 Not reported 345 52 Battery Withdrawn
GEN-2012-004 Not reported 138 40.8 Wind Operational
GEN-2008-056S Not reported n/r 4.8 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.