Carson, TX interconnection queue

2 active projects totaling 164.4 MW in the SPP queue, plus 12 with terminal status (shown grayed).

2active projects
164.4active MW
14total filed
Queue IDProjectkVMWResourceStatus
GEN-2003-021 Not reported n/r 400 Wind Withdrawn
GEN-2003-008 Not reported n/r 240 Wind Withdrawn
GEN-2003-015 Not reported n/r 240 Wind Withdrawn
GEN-2004-003 Not reported n/r 240 Wind Withdrawn
GEN-2007-045 Not reported n/r 171 Wind Withdrawn
GEN-2002-019 Not reported n/r 160 Wind Withdrawn
GEN-2003-020 Not reported 115 159.1 Wind Operational
GEN-2002-023 Not reported n/r 150 Wind Withdrawn
GEN-2020-005 Not reported 115 150 Wind Withdrawn
GEN-2023-SR17 Not reported 115 120 Battery Withdrawn
GEN-2003-009 Not reported n/r 81 Wind Withdrawn
GEN-2004-009 Not reported n/r 80 Wind Withdrawn
GEN-2016-070 Not reported 115 5.3 Wind Operational
GEN-2016-161 Not reported 115 3 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.