Substation Scout

Canadian, OK interconnection queue

11 active projects totaling 2,043.8 MW in the SPP queue, plus 16 with terminal status (shown grayed).

11active projects
2,043.8active MW
27total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-038 Not reported 345 303.6 Wind Withdrawn
GEN-2010-002 Not reported 345 300 Wind Withdrawn
GEN-2010-040 Not reported 345 300 Wind Operational
GEN-2011-054 Not reported 345 300 Wind Operational
GEN-2013-038 Not reported n/r 300 Wind Withdrawn
GEN-2024-252 Not reported 345 300 Hybrid Active
GEN-2024-254 Not reported 345 300 Hybrid Active
GEN-2011-007 Not reported 345 250.1 Wind Withdrawn
GEN-2014-056 Not reported 345 250 Wind Operational
GEN-2012-030 Not reported 345 200 Wind Withdrawn
GEN-2012-031 Not reported 345 200 Wind Withdrawn
GEN-2015-002 Not reported 345 200 Solar Withdrawn
GEN-2022-163 Not reported 345 200 Battery Withdrawn
GEN-2024-239 Not reported 345 200 Battery Active
GEN-2001-015 Not reported n/r 180 Gas Withdrawn
GEN-2022-235 Not reported 138 150 Battery Active
GEN-2023-051 Not reported 138 150 Hybrid Withdrawn
GEN-2019-052 Not reported 345 135 Solar Withdrawn
GEN-2008-035 Not reported n/r 100 Wind Withdrawn
GEN-2008-036 Not reported n/r 100 Wind Withdrawn
GEN-2018-026 Not reported 138 100 Battery Active
GEN-2021-041 Not reported 138 100 Battery Active
GEN-2013-025 Not reported 345 50 Wind Withdrawn
GEN-2017-028 Not reported 138 50 Solar Withdrawn
GEN-2019-067 Not reported 345 30 Battery Withdrawn
GEN-2016-047 Not reported 69 24 Gas Operational
GEN-2017-117 Not reported 138 19.8 Battery Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.