Substation Scout

Butte, SD interconnection queue

1 active project totaling 103.2 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
103.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2019-017 Not reported 115 142.8 Wind Withdrawn
GEN-2014-001IS Not reported 115 103.2 Wind Operational
GEN-2023-067 Not reported 115 41 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first