Briscoe, TX interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 1 with terminal status (shown grayed).

0active projects
0active MW
1total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-043 Not reported 230 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.