Blaine, OK interconnection queue
2 active projects totaling 374.1 MW in the SPP queue, plus 7 with terminal status (shown grayed).
2active projects
374.1active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2010-028 | Not reported | 345 | 335 | Wind | Withdrawn |
| GEN-2014-058 | Not reported | 345 | 300 | Wind | Withdrawn |
| GEN-2007-044 | Not reported | 345 | 299.2 | Wind | Operational |
| GEN-2007-060 | Not reported | n/r | 202 | Wind | Withdrawn |
| GEN-2014-061 | Not reported | 345 | 161 | Wind | Withdrawn |
| GEN-2007-006 | Not reported | 138 | 160 | Wind | Withdrawn |
| GEN-2021-002 | Not reported | 138 | 100 | Battery | Withdrawn |
| GEN-2023-161 | Not reported | 138 | 74.9 | Battery | Active |
| GEN-2014-003 | Not reported | 345 | 15.8 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.