Queue IDProjectkVMWResourceStatus
GEN-2010-028 Not reported 345 335 Wind Withdrawn
GEN-2014-058 Not reported 345 300 Wind Withdrawn
GEN-2007-044 Not reported 345 299.2 Wind Operational
GEN-2007-060 Not reported n/r 202 Wind Withdrawn
GEN-2014-061 Not reported 345 161 Wind Withdrawn
GEN-2007-006 Not reported 138 160 Wind Withdrawn
GEN-2021-002 Not reported 138 100 Battery Withdrawn
GEN-2023-161 Not reported 138 74.9 Battery Active
GEN-2014-003 Not reported 345 15.8 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.