Beckham, OK interconnection queue
4 active projects totaling 531.8 MW in the SPP queue, plus 14 with terminal status (shown grayed).
4active projects
531.8active MW
18total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2011-049 | Not reported | 345 | 250.7 | Wind | Withdrawn |
| GEN-2021-010 | Not reported | 345 | 208 | Solar | Withdrawn |
| GEN-2021-014 | Not reported | 345 | 208 | Solar | Withdrawn |
| GEN-2021-012 | Not reported | 345 | 203 | Battery | Withdrawn |
| GEN-2015-071 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2024-154 | Not reported | 345 | 200 | Solar | Active |
| GEN-2008-039 | Not reported | n/r | 150 | Wind | Withdrawn |
| GEN-2009-070 | Not reported | 138 | 150 | Wind | Withdrawn |
| GEN-2006-035 | Not reported | 230 | 132 | Wind | Operational |
| GEN-2006-002 | Not reported | 230 | 100.8 | Wind | Operational |
| GEN-2010-018 | Not reported | 138 | 100.8 | Wind | Withdrawn |
| GEN-2009-016 | Not reported | 138 | 100.3 | Wind | Withdrawn |
| GEN-2006-043 | Not reported | 230 | 99 | Wind | Operational |
| GEN-2007-049 | Not reported | n/r | 60 | Wind | Withdrawn |
| GEN-2015-004 | Not reported | 345 | 52.9 | Wind | Withdrawn |
| GEN-2019-066 | Not reported | 230 | 50 | Battery | Withdrawn |
| GEN-2015-055 | Not reported | 138 | 40 | Solar | Withdrawn |
| GEN-2020-SR1 | Not reported | 138 | 40 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.