Beckham, OK interconnection queue

4 active projects totaling 531.8 MW in the SPP queue, plus 14 with terminal status (shown grayed).

4active projects
531.8active MW
18total filed
Queue IDProjectkVMWResourceStatus
GEN-2011-049 Not reported 345 250.7 Wind Withdrawn
GEN-2021-010 Not reported 345 208 Solar Withdrawn
GEN-2021-014 Not reported 345 208 Solar Withdrawn
GEN-2021-012 Not reported 345 203 Battery Withdrawn
GEN-2015-071 Not reported 345 200 Wind Withdrawn
GEN-2024-154 Not reported 345 200 Solar Active
GEN-2008-039 Not reported n/r 150 Wind Withdrawn
GEN-2009-070 Not reported 138 150 Wind Withdrawn
GEN-2006-035 Not reported 230 132 Wind Operational
GEN-2006-002 Not reported 230 100.8 Wind Operational
GEN-2010-018 Not reported 138 100.8 Wind Withdrawn
GEN-2009-016 Not reported 138 100.3 Wind Withdrawn
GEN-2006-043 Not reported 230 99 Wind Operational
GEN-2007-049 Not reported n/r 60 Wind Withdrawn
GEN-2015-004 Not reported 345 52.9 Wind Withdrawn
GEN-2019-066 Not reported 230 50 Battery Withdrawn
GEN-2015-055 Not reported 138 40 Solar Withdrawn
GEN-2020-SR1 Not reported 138 40 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.