Barton, KS interconnection queue

2 active projects totaling 200 MW in the SPP queue, plus 5 with terminal status (shown grayed).

2active projects
200active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-010 Not reported 230 199.5 Wind Withdrawn
GEN-2009-014 Not reported 115 151 Gas Withdrawn
GEN-2009-009 Not reported 115 150 Wind Withdrawn
GEN-2018-116 Not reported 115 150 Solar Withdrawn
GEN-2019-054 Not reported 230 150 Solar Suspended
GEN-2019-068 Not reported 230 50 Battery Suspended
GEN-2019-051 Not reported 115 40 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first