Barry, MO interconnection queue
1 active project totaling 130 MW in the SPP queue, plus 2 with terminal status (shown grayed).
1active projects
130active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2017-188 | Not reported | 161 | 130 | Solar | Active |
| GEN-2019-035 | Not reported | 161 | 80 | Solar | Withdrawn |
| GEN-2023-234 | Not reported | 161 | 74.9 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.