0 active projects
totaling 0 MW in the SPP queue, plus 6 with terminal status (shown grayed).
0active projects
0active MW
6total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2018-045
Not reported
345
550
Solar
Withdrawn
GEN-2018-046
Not reported
345
400
Wind
Withdrawn
GEN-2022-188
Not reported
345
290
Wind
Withdrawn
GEN-2023-083
Not reported
345
200
Hybrid
Withdrawn
GEN-2015-094
Not reported
345
151.8
Wind
Withdrawn
GEN-2016-034
Not reported
345
90
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.