Substation Scout

Bailey, TX interconnection queue

2 active projects totaling 548.9 MW in the SPP queue, plus 13 with terminal status (shown grayed).

2active projects
548.9active MW
15total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-240 Not reported 345 550 Solar Withdrawn
GEN-2024-109 Not reported 345 400.5 Wind Active
GEN-2023-158 Not reported 230 335 Solar Withdrawn
GEN-2017-190 Not reported 230 300.3 Solar Withdrawn
GEN-2023-195 Not reported 230 250 Solar Withdrawn
GEN-2017-039 Not reported 230 200.1 Wind Withdrawn
GEN-2023-159 Not reported 230 170 Battery Withdrawn
GEN-2005-010 Not reported n/r 160 Wind Withdrawn
GEN-2007-034 Not reported n/r 150 Wind Withdrawn
GEN-2023-196 Not reported 230 150 Battery Withdrawn
GEN-2013-027 Not reported 230 148.4 Wind Operational
GEN-2016-078 Not reported 115 108 Solar Withdrawn
GEN-2016-089 Not reported 230 100 Solar Withdrawn
GEN-2014-009 Not reported 69 83.7 Wind Withdrawn
GEN-2018-085 Not reported 230 74 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first