Bailey, TX interconnection queue
2 active projects totaling 548.9 MW in the SPP queue, plus 13 with terminal status (shown grayed).
2active projects
548.9active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-240 | Not reported | 345 | 550 | Solar | Withdrawn |
| GEN-2024-109 | Not reported | 345 | 400.5 | Wind | Active |
| GEN-2023-158 | Not reported | 230 | 335 | Solar | Withdrawn |
| GEN-2017-190 | Not reported | 230 | 300.3 | Solar | Withdrawn |
| GEN-2023-195 | Not reported | 230 | 250 | Solar | Withdrawn |
| GEN-2017-039 | Not reported | 230 | 200.1 | Wind | Withdrawn |
| GEN-2023-159 | Not reported | 230 | 170 | Battery | Withdrawn |
| GEN-2005-010 | Not reported | n/r | 160 | Wind | Withdrawn |
| GEN-2007-034 | Not reported | n/r | 150 | Wind | Withdrawn |
| GEN-2023-196 | Not reported | 230 | 150 | Battery | Withdrawn |
| GEN-2013-027 | Not reported | 230 | 148.4 | Wind | Operational |
| GEN-2016-078 | Not reported | 115 | 108 | Solar | Withdrawn |
| GEN-2016-089 | Not reported | 230 | 100 | Solar | Withdrawn |
| GEN-2014-009 | Not reported | 69 | 83.7 | Wind | Withdrawn |
| GEN-2018-085 | Not reported | 230 | 74 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.