Andrew, MO interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-209 Not reported 345 600 Hybrid Withdrawn
GEN-2022-208 Not reported 345 400 Wind Withdrawn
GEN-2023-163 Not reported 161 150 Solar Withdrawn
GEN-2024-005 Not reported 161 150 Solar Withdrawn
GEN-2022-101 Not reported 161 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.