Substation Scout

Adams, NE interconnection queue

1 active project totaling 11 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
11active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2001-029N1 Not reported n/r 250 Coal Withdrawn
GEN-2004-018N Not reported n/r 220 Coal Withdrawn
GEN-2004-022N Not reported n/r 11 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first