1 active project totaling 100 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

3 Southern Company queue filings name Waynesboro - Lucedale line as the point of interconnection, all in MS.

1active projects
100active MW
3total filed
Queue IDProjectkVMWResourceStatus
25-IC-1337 Not reported 115 100 Hybrid Active
IC-1184 Not reported 115 100 Solar Withdrawn
IC-1028 Not reported 115 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.