Substation Scout

Vidalia - Wadley Primary (Black) Line substation interconnection queue

4 active projects totaling 538 MW in the Southern Company queue, plus 3 with terminal status (shown grayed).

7 Southern Company queue filings name Vidalia - Wadley Primary (Black) Line as the point of interconnection, all in Emanuel County, GA.

4active projects
538active MW
7total filed
Queue IDProjectkVMWResourceStatus
IC-770 Not reported 230 240 Solar Withdrawn
IC-1097 Not reported 230 200 Solar Active
IC-964 Not reported 230 150 Hybrid Suspended
IC-776 Not reported 230 125 Solar Withdrawn
IC-1068 Not reported 230 124 Hybrid Active
IC-902 Not reported 230 76 Hybrid Withdrawn
IC-1103 Not reported 230 64 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first