Thalmann TS Bus substation interconnection queue

3 active projects totaling 1,700 MW in the Southern Company queue, plus 9 with terminal status (shown grayed).

12 Southern Company queue filings name Thalmann TS Bus as the point of interconnection, all in Glynn County, GA.

3active projects
1,700active MW
12total filed
Queue IDProjectkVMWResourceStatus
IC-942 Not reported 500 1,200 Hybrid Suspended
IC-007 Not reported 500 620 Gas Withdrawn
IC-101 Not reported 500 553 Gas Withdrawn
IC-107 Not reported 500 508 Gas Withdrawn
IC-700 Not reported 500 280 Solar Withdrawn
IC-932 Not reported 230 250 Hybrid Suspended
IC-933 Not reported 230 250 Hybrid Suspended
IC-346 Not reported 230 215 Solar Withdrawn
IC-901 Not reported 230 200 Hybrid Withdrawn
IC-345 Not reported 230 140 Solar Withdrawn
IC-698 Not reported 230 75 Solar Withdrawn
IC-344 Not reported 230 70 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.