Substation Scout

Smith - Sinai Cemetary Line substation interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 5 with terminal status (shown grayed).

5 Southern Company queue filings name Smith - Sinai Cemetary Line as the point of interconnection, all in Calhoun County, FL.

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
IC-712 Not reported 230 350 Solar Withdrawn
IC-599 Not reported 230 74.9 Solar Withdrawn
IC-745 Not reported 230 74.5 Solar Withdrawn
IC-631 Not reported 230 54.2 Solar Withdrawn
IC-656 Not reported 230 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first