North Americus - Perry Line substation interconnection queue
0 active projects totaling 0 MW in the Southern Company queue, plus 9 with terminal status (shown grayed).
9 Southern Company queue filings name North Americus - Perry Line as the point of interconnection, all in GA.
0active projects
0active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-739 | Not reported | 115 | 150 | Hybrid | Withdrawn |
| IC-798 | Not reported | 115 | 150 | Solar | Withdrawn |
| IC-600 | Not reported | 115 | 135 | Solar | Withdrawn |
| IC-481 | Not reported | 115 | 98.1 | Solar | Withdrawn |
| IC-597 | Not reported | 115 | 60 | Solar | Withdrawn |
| IC-713 | Not reported | 115 | 52 | Solar | Withdrawn |
| IC-1010 | Not reported | 115 | 38 | Solar | Withdrawn |
| IC-582 | Not reported | 115 | 20 | Solar | Withdrawn |
| IC-865 | Not reported | 115 | 1.9 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.