Substation Scout

North Americus - Perry Line substation interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 9 with terminal status (shown grayed).

9 Southern Company queue filings name North Americus - Perry Line as the point of interconnection, all in GA.

0active projects
0active MW
9total filed
Queue IDProjectkVMWResourceStatus
IC-739 Not reported 115 150 Hybrid Withdrawn
IC-798 Not reported 115 150 Solar Withdrawn
IC-600 Not reported 115 135 Solar Withdrawn
IC-481 Not reported 115 98.1 Solar Withdrawn
IC-597 Not reported 115 60 Solar Withdrawn
IC-713 Not reported 115 52 Solar Withdrawn
IC-1010 Not reported 115 38 Solar Withdrawn
IC-582 Not reported 115 20 Solar Withdrawn
IC-865 Not reported 115 1.9 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first