Millers Ferry - Sunny South Line substation interconnection queue
0 active projects
totaling 0 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).
2 Southern Company queue filings name Millers Ferry - Sunny South Line as the point of interconnection, all in Wilcox County, AL.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
IC-809
Not reported
115
220
Hybrid
Withdrawn
IC-854
Not reported
115
88
Hybrid
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Southern Company before relying on these figures.