Home / Southern Company / Substations / Jasper East SS Substation Bus
Jasper East SS Substation Bus substation interconnection queue
2 active projects
totaling 200 MW in the Southern Company queue, plus 1 with terminal status (shown grayed).
3 Southern Company queue filings name Jasper East SS Substation Bus as the point of interconnection, all in Jasper County, MS.
2 active projects
200 active MW
3 total filed
Queue ID Project kV MW Resource Status
IC-1145
Not reported
230
156
Solar
Active
IC-1031
Not reported
230
150
Hybrid
Withdrawn
IC-1203
Not reported
230
44
Solar
Active
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Southern Company before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.