Substation Scout

Greenville - Pintlala Line substation interconnection queue

2 active projects totaling 138 MW in the Southern Company queue, plus 10 with terminal status (shown grayed).

12 Southern Company queue filings name Greenville - Pintlala Line as the point of interconnection, all in AL.

2active projects
138active MW
12total filed
Queue IDProjectkVMWResourceStatus
IC-968 Not reported 115 300 Solar Withdrawn
IC-1169 Not reported 115 200 Hybrid Withdrawn
IC-1182 Not reported 115 138 Hybrid Withdrawn
IC-1007 Not reported 115 80 Solar Withdrawn
IC-1008 Not reported 115 80 Solar Withdrawn
IC-1020 Not reported 115 80 Hybrid Withdrawn
IC-1092 Not reported 115 80 Hybrid Withdrawn
IC-1093 Not reported 115 80 Hybrid Withdrawn
IC-1154 Not reported 115 80 Hybrid Withdrawn
IC-711 Not reported 115 80 Solar Withdrawn
IC-971 Not reported 115 80 Hybrid Suspended
IC-955 Not reported 115 58 Hybrid Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first