Home / Southern Company / Substations / Gordon Substation Bus
Gordon Substation Bus substation interconnection queue
1 active project
totaling 220 MW in the Southern Company queue, plus 1 with terminal status (shown grayed).
2 Southern Company queue filings name Gordon Substation Bus as the point of interconnection, all in Wilkinson County, GA.
1 active projects
220 active MW
2 total filed
Queue ID Project kV MW Resource Status
IC-1187
Not reported
115
220
Battery
Active
IC-322
Not reported
115
50
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Southern Company before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.