Fulton Springs - Gorgas No. 2 Line substation interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

2 Southern Company queue filings name Fulton Springs - Gorgas No. 2 Line as the point of interconnection, all in Walker County, AL.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
IC-1080 Not reported 115 80 Solar Withdrawn
IC-1081 Not reported 115 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.