Substation Scout

Farley - South Bainbridge Line substation interconnection queue

2 active projects totaling 449 MW in the Southern Company queue, plus 5 with terminal status (shown grayed).

7 Southern Company queue filings name Farley - South Bainbridge Line as the point of interconnection, all in GA.

2active projects
449active MW
7total filed
Queue IDProjectkVMWResourceStatus
IC-217 Not reported 230 700 Coal Withdrawn
IC-222 Not reported 230 700 Coal Withdrawn
IC-789 Not reported 230 260.1 Solar Active
IC-911 Not reported 230 220 Solar Withdrawn
IC-833 Not reported 230 200 Hybrid Withdrawn
IC-441 Not reported 230 188.9 Solar Active
IC-467 Not reported 230 118 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first