Substation Scout

Elsanor - Mobile Hwy (GULF) Line substation interconnection queue

2 active projects totaling 160 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

4 Southern Company queue filings name Elsanor - Mobile Hwy (GULF) Line as the point of interconnection, all in Baldwin County, AL.

2active projects
160active MW
4total filed
Queue IDProjectkVMWResourceStatus
IC-861 Not reported 230 400 Other Withdrawn
IC-880 Not reported 230 200 Hybrid Withdrawn
IC-1000 Not reported 230 80 Hybrid Suspended
IC-999 Not reported 230 80 Hybrid Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first