Eastman Primary - Hatch Line substation interconnection queue

2 active projects totaling 299 MW in the Southern Company queue, plus 3 with terminal status (shown grayed).

5 Southern Company queue filings name Eastman Primary - Hatch Line as the point of interconnection, all in GA.

2active projects
299active MW
5total filed
Queue IDProjectkVMWResourceStatus
IC-634 Not reported 230 248.5 Solar Withdrawn
IC-542 Not reported 230 200 Solar Withdrawn
25-IC-1342 Not reported 230 199 Solar Active
25-IC-1343 Not reported 230 100 Battery Active
IC-336 Not reported 230 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.