Demopolis - Selma Line substation interconnection queue
1 active project totaling 80 MW in the Southern Company queue, plus 9 with terminal status (shown grayed).
10 Southern Company queue filings name Demopolis - Selma Line as the point of interconnection, all in AL.
1active projects
80active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-855 | Not reported | 115 | 220 | Hybrid | Withdrawn |
| IC-1242 | Not reported | 115 | 100 | Solar | Withdrawn |
| IC-804 | Not reported | 115 | 100 | Solar | Withdrawn |
| IC-1083 | Not reported | 115 | 80 | Solar | Suspended |
| IC-1096 | Not reported | 115 | 80 | Hybrid | Withdrawn |
| IC-433 | Not reported | 115 | 80 | Solar | Withdrawn |
| IC-985 | Not reported | 115 | 80 | Hybrid | Withdrawn |
| IC-479 | Not reported | 115 | 79.2 | Solar | Withdrawn |
| IC-424 | Not reported | 115 | 74.5 | Solar | Withdrawn |
| IC-417 | Not reported | 115 | 19.7 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.