Bynum - Jackson Shoals Line substation interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

2 Southern Company queue filings name Bynum - Jackson Shoals Line as the point of interconnection, all in Talladega County, AL.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
IC-1173 Not reported 115 200 Hybrid Withdrawn
IC-572 Not reported 46 59.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.